- Home
- Your Government
- Projects
- Future Projects
- Ohrts Subdivision Storm Drain System
This project will alleviate localized frequent flooding in the Orht's Addition Subdivision by installing a storm drain system to connect individual failing drywells to the Vancouver Street storm drain system. This will eliminate the need to monitor and collect surface stormwater during large stormwater events, saving staff and equipment time. It will also eliminate the potential flooding of nearby homes, and the damage to the streets from a wet subgrade.
Start Date: | 2021 |
Est. End Date: | TBD |
Funding Source: | General Storm fund |
Design and construction in 2021.
Last updated 10/26/2020